Building 059: Phase 1 Pipe Chase Room Remediation

  • 1. Rockwell International Corp., Canoga Park, CA (USA). Energy Technology Engineering Center

Description

This report documents the Phase I activities and results of the Building 059 Remediation project. The project consisted of removing, packaging, and shipping approximately 30 linear feet of 5-ft-dia activated steel vacuum duct and supports, over 100 tons of activated sand, and miscellaneous other radioactive waste for burial at the DOE radioactive burial site in Hanford, Washington. A total of 4562 ft3 of low specific activity waste was disposed of during the project. Following removal of the activated materials, the region of water intrusion into the Pipe Chase Room was identified and sealed. All technical objectives of the Phase I portion of the project were achieved

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A03/MF A01 - OSTI as DE89014331; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
37 p.
Report number
ETEC--89-3

Optional Information

Contract/Grant/Project number
Contract DOE AC03-76SF00700