Published November 17, 1995 | Version v1
Report

D0 Silicon Upgrade: Lower Cleanroom Roof Quick Load Analysis

Description

This engineering note documents calculations done to determine the margin of safety for the lower clean room roof. The analysis was done to give me a feeling of what the loads, stresses and capacity of the roof is prior to installation and installation work to be done for the helium refrigerator upgrade. The result of this quick look showed that the calculated loads produce stress values and loads at about half the allowables. Based on this result, I do not think that special precautions above personal judgement are required for the installation work.

Availability note (English)

Available from http://lss.fnal.gov/cgi-bin/find_paper.pl?d0-en-440.pdf.pdf; PURL: https://www.osti.gov/servlets/purl/1033291/

Additional details

Publishing Information

Imprint Pagination
9 p.
Report number
FERMILAB-D--0-EN-440

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
43017662
Subject category
S42: ENGINEERING;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
CAPACITY; CLEAN ROOMS; FERMILAB TEVATRON; HELIUM; LOAD ANALYSIS; REFRIGERATORS; ROOFS; SAFETY; SILICON; STRESSES
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; ELEMENTS; FLUIDS; GASES; MECHANICAL STRUCTURES; NONMETALS; RARE GASES; SEMIMETALS; SYNCHROTRONS

Optional Information

Contract/Grant/Project number
AC02-07CH11359
Notes
doi 10.2172/1033291
Funding organization
DOE Office of Science (United States)