Published May 1994
| Version v1
Journal article
Building a nuclear power plant from A to Z: Chooz B as an example
Creators
Description
From the design studies to the tests and reactor divergence, building a nuclear power plant involves strictly planned operations. This issue deals with the operations carried out first in the design offices and then on the site, in order to achieve such a vast and sophisticated industrial project: organizing, designing, engineering, assembling, testing, manufacturing and transporting heavy components. These various phases are shown through the example of Chooz B, a nuclear power plant with two 1.450 MW units, which is being built in the Ardennes, and whose first reactor will diverge in 1995. (author)
Additional details
Additional titles
- Original title (French)
- La construction d'une centrale nucleaire de A a Z: l'exemple de Chooz B
Publishing Information
- Journal Title
- Revue Generale Nucleaire
- Journal Issue
- no.3
- Journal Page Range
- p. 182-241.
- ISSN
- 0335-5004
- CODEN
- RGNUDJ
INIS
- Country of Publication
- France
- Country of Input or Organization
- France
- INIS RN
- 26037903
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- ARDENNES B-1 REACTOR; CIVIL ENGINEERING; CONSTRUCTION; CONTAINMENT BUILDINGS; MANUFACTURING; NONDESTRUCTIVE TESTING; PLANNING; QUALITY ASSURANCE; QUALITY CONTROL; TESTING; TRANSPORT
- Descriptors DEC
- BUILDINGS; CONTAINMENT; CONTROL; ENGINEERING; ENRICHED URANIUM REACTORS; MATERIALS TESTING; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS