Published May 14, 2012 | Version v1
Report

Improving the Fermilab Booster Notching Efficiency, Beam Losses and Radiation Levels

Description

A fast vertical 1.08-m long kicker (notcher) located in the Fermilab Booster Long-05 straight section is currently used to remove 3 out of 84 circulating bunches after injection to generate an abort gap. With the maximum magnetic field of 72.5 Gauss, it removes only 87% of the 3-bunch intensity at 400 MeV, with 75% loss on pole tips of the focusing Booster magnets, 11% on the Long-06 collimators, and 1% in the rest of the ring. We propose to improve the notching efficiency and reduce beam loss in the Booster by using three horizontal kickers in the Long-12 section. STRUCT calculations show that using horizontal notchers, one can remove up to 96% of the 3-bunch intensity at 400-700 MeV, directing 95% of it to a new beam dump at the Long-13 section. This fully decouples notching and collimation. The beam dump absorbs most of the impinging proton energy in its jaws. The latter are encapsulated into an appropriate radiation shielding that reduces impact on the machine components, personnel and environment to the tolerable levels. MARS simulations show that corresponding prompt and residual radiation levels can be reduced ten times compared to the current ones.

Availability note (English)

Available from Fermi National Accelerator Laboratory (FNAL), Batavia, IL

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
FERMILAB-CONF--12-154-AD-APC

Conference

Title
3. International Particle Accelerator Conference
Acronym
IPAC 2012
Dates
20-25 May 2012
Place
New Orleans, LA (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
43127138
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; BEAM DUMPS; COLLIMATORS; EFFICIENCY; FERMILAB; FOCUSING; MAGNETIC FIELDS; MAGNETS; PERSONNEL; PROTONS; RADIATIONS; SHIELDING
Descriptors DEC
BARYONS; ELEMENTARY PARTICLES; EQUIPMENT; FERMIONS; HADRONS; NATIONAL ORGANIZATIONS; NUCLEONS; US DOE; US ORGANIZATIONS

Optional Information

Contract/Grant/Project number
AC02-07CH11359
Notes
Conf.Proc.C1205201:562-564,2012
Funding organization
DOE Office of Science (United States)