Current Status of Kijang Research Reactor Project

  • 1. Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

Description

Construction of the full-scale mock-up (Fig. 3) to establish optimized Mo-99 production system has been completed in last year. First hot test for the verification of the process is scheduled in 2018 in HANARO. KAERI's process facility handling of the intermediate-level liquid wastes and reduces purification steps from the Mo-99 production. Additionally, compact chilled carbon column concept has been developed to mitigate xenon emission from the Mo-99 production for CTBT purpose. Cold test runs for the developed fission Mo-99 process have been achieved in full-scale. Hot production test in HANARO is on standby. The hot test of fission moly (FM) target is waiting for the restart of HANARO, a research reactor at KAERI. The activity of 2 target plates after 7 days of irradiation will be 10.84 Ci by MCNP6 calculation. The normal FM target will have 8 plates. The intermediate-level liquid radioactive waste treatment is one of the main design issues in the KJRR facility. About 3 m3/yr of radioactive waste is produced during radioisotope production.

Part of:
Proceedings of the KNS 2018 Spring Meeting

Additional details

Identifiers

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS 2018 Spring Meeting
Imprint Pagination
vp.
Journal Page Range
[3 p.]

Conference

Title
2018 Spring Meeting of the KNS
Dates
16-18 May 2018
Place
Jeju (Korea, Republic of)

Optional Information

Notes
2 refs, 3 figs