Specific features of construction process of NPP prestressed cable cooling tower

Creators

Description

Design and technology of construction of prestressed cable cooling tower at the Schmehausen NPP with INIR-300 reactor is described. Reinforced concrete pylon of 181 meter height, on which special cable grid is fixed , forms the basis of the cooling tower. The cable grid strength is provided with two ring steel diaphragms. The cable grid is lined by aluminium corrugated panels 1 mm thick. Experience of operation of prestressed cable cooling tower has demonstrated high construction reliability