Mitigation effects using inventory of safety injection tanks for high pressure severe accident sequence
Description
If high pressure safety injection pumps are not working for a total loss of feed water sequence, then this results in a severe accident inevitably. Nevertheless, a rapid depressurization using the POSRV could still mitigate the severe accident by providing a cooling water into a damaged core from safety injection tanks(SIT) which are passive systems. The purpose of this paper is to estimate how long the reactor vessel failure can be delayed by using the passive safety injection tanks for typical high pressure sequences at the KNGR. Based on MAAP calculation, the results show that the reactor vessel failure can be delayed about 7 hours if the inventory of four SITs is effectively used to remove the decay heat through the primary feed and bleed operation
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Taejon (Korea, Republic of)
- Imprint Title
- Proceedings of the Korean Nuclear Society spring meeting
- Imprint Pagination
- [ONE CDROM]
- Journal Page Range
- [9 p.]
Conference
- Title
- 2001 spring meeting of the Korean Nuclear Society
- Dates
- 24-25 May 2001
- Place
- Cheju (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 33040405
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- AFTER-HEAT; DEPRESSURIZATION SYSTEMS; FAILURES; HIGH PRESSURE; PUMPS; REACTOR ACCIDENTS; REACTOR VESSELS; SAFETY INJECTION; TANKS; WATER
- Descriptors DEC
- ACCIDENTS; CONTAINERS; EQUIPMENT; HYDROGEN COMPOUNDS; OXYGEN COMPOUNDS
Optional Information
- Notes
- 10 figs, 1 tab