Published March 2007 | Version v1
Report

Commissioning strategies for J-PARC linac and L3BT

  • 1. High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan)
  • 2. Japan Atomic Energy Agency, Tokai, Ibaraki (Japan)

Description

We will start beam commissioning of J-PARC linac in December 2006. The commissioning plan and the priorities of commissioning procedures are described together with some characteristic features of the commissioning procedures. (author)

Part of:
HB2006: Proceedings of the 39th ICFA advanced beam dynamics workshop. High intensity, high brightness hadron beams

Additional details

Publishing Information

Imprint Title
HB2006: Proceedings of the 39th ICFA advanced beam dynamics workshop. High intensity, high brightness hadron beams
Imprint Pagination
[402 p.]
Journal Page Range
[3 p.]
Report number
KEK-PROC--2006-15

Conference

Title
39. ICFA advanced beam dynamics workshop. High intensity, high brightness hadron beams
Acronym
HB2006
Dates
29 May - 2 Jun 2006
Place
Tsukuba, Ibaraki (Japan)

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
39011841
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BEAM BUNCHERS; BEAM DUMPS; BEAM TRANSPORT; COLLIMATORS; COMMISSIONING; DRIFT TUBES; HYDROGEN 1 MINUS BEAMS; J-PARC; MEV RANGE 100-1000; PLANNING; QUADRUPOLE LINACS; TUNING
Descriptors DEC
ACCELERATORS; BEAMS; CYCLIC ACCELERATORS; ENERGY RANGE; ION BEAMS; LINEAR ACCELERATORS; MEV RANGE; SYNCHROTRONS

Optional Information

Notes
This CD-ROM can be used for WINDOWS 9x/NT/2000/ME/XP, MACINTOSH; Acrobat Reader is included; Data in PDF format, Folder Name PAPERS, Paper ID THBZ02.pdf; 17 refs., 1 fig., 3 tabs.