Published January 2007 | Version v1
Miscellaneous Open

Information letter 12. Information about operation of Jadrova vyradovacia spolocnost, a.s. and plants SE-NPP Bohunice during December 2006

Description

In this leaflet results of exploitation of four units of the Bohunice V1 and V2 NPPs are presented. The electricity and heat production in December 2006 are reviewed. Within a December 2006 the electricity was produced in NPP V1: 301.221 GWh (block 1), 281.125 GWh (block 2), totally 582.346 GWh, and 6179.205 GWh within a January - December 2006. Within a November 2006 the NPP V2: the block 3 and block 4 has worked in stabile regime according to needs of regulation. Processing and storage of radioactive wastes in Jadrova vyradovacia spolocnost (JAVYS) is presented. Twenty pieces of fibre-concrete containers were processed into fibre-concrete containers in Bohunice processing centre of radioactive wastes (BSC RAO) in December 2006. Eight fibre-concrete containers were stored into Republic storage of radioactive wastes (RU RAO). Total number in RU RAO reached 1260 pieces of fibre-concrete containers, which represent 17.50 per cent of storage capacity (7200 containers)

Availability note (English)

Available from INIS in electronic form

Files

38059353.pdf

Files (330.0 kB)

Name Size Download all
md5:5683117ccfd9f19572d7c35ff6014c31
330.0 kB Preview Download

Additional details

Additional titles

Original title (Slovak)
Informacny list 12. Informacie o cinnosti Jadrovej vyradovacej spolocnosti, a.s. a zavodu SE-EBO za 12/2006

Publishing Information

Publisher
Jadrova vyradovacia spolocnost, a.s.
Imprint Place
Jaslovske Bohunice (Slovakia)
Imprint Pagination
2 p.
Report number
INIS-SK--2007-006

Optional Information

Notes
2 tab.; English version can be ordered from Omega Info, Vysehradska 33, 851 06 Bratislava, Slovak Republic (e-mail: info@omegainfo.sk), at USD 15.- per standard typewritten page (1800 characters)