Published February 2009 | Version v1
Journal article

Estimating deficit probabilities with price-responsive demand in contract-based electricity markets

  • 1. Facultad de Ciencias Economicas y Empresariales, Universidad de los Andes, Santiago (Chile)
  • 2. Departamento de Ingenieria Electrica, Universidad de Chile, Mariano Sanchez Fontecilla 310, piso 3 Las Condes, Santiago (Chile)

Description

Studies that estimate deficit probabilities in hydrothermal systems have generally ignored the response of demand to changing prices, in the belief that such response is largely irrelevant. We show that ignoring the response of demand to prices can lead to substantial over or under estimation of the probability of an energy deficit. To make our point we present an estimation of deficit probabilities in Chile's Central Interconnected System between 2006 and 2010. This period is characterized by tight supply, fast consumption growth and rising electricity prices. When the response of demand to rising prices is acknowledged, forecasted deficit probabilities and marginal costs are shown to be substantially lower. (author)

Availability note (English)

Available from Available from: http://dx.doi.org/10.1016/j.enpol.2008.09.079

Additional details

Identifiers

Publishing Information

Journal Title
Energy Policy
Journal Volume
37
Journal Issue
2
Journal Page Range
p. 560-569
ISSN
0301-4215
CODEN
ENPYAC

INIS

Country of Publication
United Kingdom
Country of Input or Organization
United Kingdom
INIS RN
40031836
Subject category
S29: ENERGY PLANNING, POLICY AND ECONOMY;
Descriptors DEI
CHILE; CONTRACTS; ECONOMIC ELASTICITY; ELECTRICITY; HYDROTHERMAL SYSTEMS; MARKET; PRICES; PROBABILITY
Descriptors DEC
DEVELOPING COUNTRIES; ENERGY SYSTEMS; GEOTHERMAL SYSTEMS; LATIN AMERICA; SOUTH AMERICA

Optional Information

Notes
Elsevier Ltd. All rights reserved