Published April 2023 | Version v1
Report

Development of methods for internal event (level 1) multi-unit PRA

  • 1. Central Research Institute of Electric Power Industry, Nuclear Risk Research Center, Risk Assessment Research Team, Yokosuka, Kanagawa (Japan)

Description

On March 11, 2011, the Fukushima Daiichi nuclear accident, triggered by the earthquake and tsunami, revealed the significant risk at a site with multiple nuclear power reactors. Since then, multi-unit probabilistic risk assessment (MUPRA) has attracted increased attention. Although several research groups have proposed frameworks for MUPRA, only a few MUPRAs have been conducted in the industry. This report provides an evaluation framework for an internal-event Level 1 MUPRA by extending single-unit probabilistic risk assessment (SUPRA) models to an MUPRA model. The proposed MUPRA framework is based on conventional SUPRA event tree/fault tree (ET/FT) and minimal cutset methods. The framework provides a procedure for extending the existing SUPRA models to an MUPRA model. In addition, the framework provides methods for (1) inter-unit common-cause failure analysis, (2) multi-unit human reliability analysis, and (3) multi-unit accident sequence development and frequency quantification. This report provides an example of MUPRA implementation using the framework. The example is a case study of two advanced boiling water reactors with a loss of off-site power as the initiating event, and the feasibility of the framework is confirmed through this case study. (author)

Availability note (English)

Available from https://criepi.denken.or.jp/hokokusho/pb/reportDetail?reportNoUkCode=NR22003

Additional details

Additional titles

Original title (Japanese)
内的事象レベル1 マルチユニットPRA手法の開発

Publishing Information

Imprint Pagination
128 p.
Report number
CRIEPI--NR22003

Optional Information

Notes
39 refs., 42 figs., 16 tabs.