Published March 2011
| Version v1
Journal article
Probabilistic safety analysis of the 1000 MW PWR during shutdown state
Description
This paper initiates a study focused on shutdown safety as well as Probability Safety Analysis (PSA) for shutdown operation at 1000 MW PWR. Shutdown PSA models considering different plant outage types are constructed respectively to evaluate the risk of LOI-RRA operation. The results show that the potential risk during shutdown should not be ignored; going through the LOI-RRA operation at cool shutdown refueling outage significantly increases the plant risk. (author)
Additional details
Publishing Information
- Journal Title
- China Nuclear Power
- Journal Volume
- 4
- Journal Issue
- 1
- Journal Page Range
- p. 68-75
- ISSN
- 1674-1617
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 45059079
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- HAZARDS; OPERATION; OUTAGES; PROBABILISTIC ESTIMATION; PWR TYPE REACTORS; QINSHAN-2-1 REACTOR; RADIORECEPTOR ASSAY; SAFETY ANALYSIS; SHUTDOWN
- Descriptors DEC
- CALCULATION METHODS; ENRICHED URANIUM REACTORS; ISOTOPE APPLICATIONS; POWER REACTORS; PWR TYPE REACTORS; RADIOASSAY; REACTORS; THERMAL REACTORS; TRACER TECHNIQUES; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 6 tabs., 10 refs.