Remote servicing considerations for near term tokamak power reactors (TNS). Final summary
Description
Next generation Tokamaks require special consideration for remote servicing. Three major problems are highlighted: (1) movement of heavy components, (2) remote connection/disconnection of joints, and (3) remote cutting, welding, and leak detection. The first problem is assumed to be handled with existing expertise and is not considered. The remaining problems are thought to be minimized by considering two engineering departures from conventional tokamak design; locating the field shaping coils outside of the toroidal coils and enclosing the total device within an evacuated reactor cell. Five topics under this vacuum building concept are discussed: incremental cost, vacuum pumping, tritium containment, activation topology, and first year operations
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A03/MF A01.
Files
Additional details
Publishing Information
- Imprint Pagination
- 26 p.
- Report number
- CONF-771109--84
Conference
- Title
- ANS winter meeting.
- Dates
- 27 Nov - 2 Dec 1977.
- Place
- San Francisco, CA, USA.
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 9393495
- Subject category
- S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CUTTING; LEAK TESTING; MAINTENANCE; REMOTE HANDLING; THERMONUCLEAR REACTORS; TOKAMAK DEVICES; WELDING
- Descriptors DEC
- CLOSED PLASMA DEVICES; FABRICATION; JOINING; MACHINING; TESTING; THERMONUCLEAR DEVICES