Location of equipment in the 105K East discharge chute for installation of isolation barriers (ref USQ 94-0041): Revision 1

Description

The scope of this report is to document the final location for equipment currently located in the 105 K-East discharge chute before beginning installation of the isolation barriers and equipment that will/may be left after completion of installation. The isolation barriers are to be installed at each basin in the openings between the discharge chute and the main basin. Once installed, the isolation barriers will remain in place, permanently isolating the discharge chute from direct communication with the main basin. After the isolation barriers are installed, the equipment left in the discharge chute will not be able to be moved out of the chute without being totally removed from the water. The equipment that will be addressed by this Supporting Document includes: Crusher, Dump Table, Packager, Seal Conveyor, Old Cofferdam Doors, Joint Cover and Location Bars, Canister Basket, Air Operated Sludge Pump and Discharge Hose, Fuel Segregation Canister Table, Seal Preparation Tool, and Miscellaneous tools and equipment

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95003840; NTIS; US Govt. Printing Office Dep.

Files

26037430.pdf

Files (419.4 kB)

Name Size Download all
md5:b0a737673d58ad6ba0edda6aced05c3a
419.4 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
WHC-SD--WM-AP-030-Rev.1

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).