Heater assembly
Creators
Description
An electrical resistance heater, installed in the H1 borehole, is used to thermally perturb the rock mass through a controlled heating and cooling cycle. Heater power levels are controlled by a Variac power transformer and are measured by wattmeters. Temperatures are measured by thermocouples on the borehole wall and on the heater assembly. Power and temperature values are recorded by the DAS described in Chapter 12. The heater assembly consists of a 3.55-m (11.6-ft) long by 20.3-cm (8-in.) O.D., Type 304 stainless steel pipe, containing a tubular hairpin heating element. The element has a heated length of 3 m (9.84 ft). The power rating of the element is 10 kW; however, we plan to operate the unit at a maximum power of only 3 kW. The heater is positioned with its midpoint directly below the axis of the P2 borehole, as shown in the borehole configuration diagram. This heater midpoint position corresponds to a distance of approximately 8.5 m (27.9 ft) from the H1 borehole collar. A schematic of the heater assembly in the borehole is shown. The distance from the borehole collar to the closest point on the assembly (the front end) is 6.5 m (21.3 ft). A high-temperature inflatable packer, used to seal the borehole for moisture collection, is positioned 50 cm (19.7 in.) ahead of the heater front end. The heater is supported and centralized within the borehole by two skids, fabricated from 25-mm (1-in.) O.D. stainless steel pipe. Thermocouples are installed at a number of locations in the H1 borehole. Four thermocouples that are attached to the heater skin monitor temperatures on the outer surface of the can, while three thermocouples that are held in place by rock sections monitor borehole wall temperatures beneath the heater. Temperatures are also monitored at the heater terminal and on the packer hardware
Additional details
Additional titles
- Augmented title (English)
- Used to thermally perturb the rock mass through a controlled heating and cooling cycle
Publishing Information
- Imprint Title
- Prototype Engineered Barrier System Field Tests (PEBSFT). Progress report through November 1, 1988
- Imprint Pagination
- 120 p.
- Journal Page Range
- p. 42-51.
- Report number
- UCID--21640
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 23017483
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Resource subtype / Literary indicator
- Progress Report
- Descriptors DEI
- BOREHOLES; CONTROL; DIAGRAMS; ELECTRIC MEASURING INSTRUMENTS; ELECTRIC POWER; HEATERS; MEASURING METHODS; PERFORMANCE; POWER INPUT; PROGRESS REPORT; RADIOACTIVE WASTE FACILITIES; SITE SELECTION; TESTING; THERMOCOUPLES; TUFF; USES; YUCCA MOUNTAIN
- Descriptors DEC
- CAVITIES; ELECTRICAL EQUIPMENT; EQUIPMENT; IGNEOUS ROCKS; INFORMATION; MEASURING INSTRUMENTS; MOUNTAINS; NUCLEAR FACILITIES; POWER; ROCKS