Published 1981 | Version v1
Report Open

New AGS slow external beam switchyard

Description

The original switchyard for the Slow External Proton Beam at the AGS of Brookhaven National Laboratory incorporated two current carrying, copper septa to split the beam into three parts. These septa were each .05 mm thick and intercepted a substantial amount of beam when, as often occurs, it was necessary to split the beam across its densest region. To adjust splitting ratios and optimize losses, a complex time consuming pattern of steering adjustments using various magnets was necessary. When the question of providing a fourth beam to a new target station arose, it was clear that adding a third copper septum in the very constrained space available would lead to unacceptable increases in the radiation and control problems. In order to circumvent these difficulties, it was decided to rebuild the switchyard using much thinner electrostatic septa as splitters and to provide a greater degree of independence of the various beam segments

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01.

Files

12613842.pdf

Files (133.1 kB)

Name Size Download all
md5:96f9e795d0b2203f1c6dcdcb58d5174e
133.1 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
BNL--29176

Conference

Title
Particle accelerator conference.
Dates
11 - 13 Mar 1981.
Place
Washington, DC, USA.

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
12613842
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM SPLITTING; BEAM TRANSPORT; BROOKHAVEN AGS; PERFORMANCE; SEPTUM MAGNETS; SPECIFICATIONS; TARGET CHAMBERS
Descriptors DEC
ACCELERATOR FACILITIES; ACCELERATORS; CYCLIC ACCELERATORS; MAGNETS; SYNCHROTRONS

Optional Information

Secondary number(s)
CONF-810314--79.