Published November 1978 | Version v1
Report Restricted

Developing maintainability for tokamak fusion power systems. Phase II report. Volume II: study results

Description

In this second phase the impact of unscheduled maintenance, several vacuum wall arrangements, and maintenance of other reactor interfacing subsystems and maintenance equipment are added to the evaluation of the maintainability of the fusion power reactor concepts. Four concepts are normalized to common performance parameters and evaluated for their capability to achieve availability and cost of electricity goals considering both scheduled and unscheduled maintenance. The results of this evaluation are used to generate a series of maintainability design guidelines and to select the more desirable features and design options which are used to configure a preliminary reactor concept having improved maintainability

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A17/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
386 p.
Report number
COO--4184-6(Vol.2)