Insights of Predictive Maintenance Implementation in Nuclear Power Plants. KHNP Case Study. Annex V
Creators
- 1. Korea Hydro and Nuclear Power Co., LTD (Korea, Republic of)
Description
Most utilities are endeavouring to improve plant performance by preventing equipment failures which could lead to plant shutdown or power loss. Maintenance strategies are changed from corrective maintenance to preventive maintenance to minimize resources and cost of maintenance. To identify the condition of component degradation, several predictive maintenances have been introduced and implemented. Moreover, as on–line condition monitoring technologies are rapidly developed, early warning and prognostic maintenance are introduced to identify any adverse trends in advance. Korea Hydro & Nuclear Power Company (KHNP) has been developing a PM template for all component types used at operating units and is currently optimizing the preventive maintenance of all operating units. Five CM technologies have been implemented as predictive maintenance; some of the cases identified through these will be addressed. KHNP is also developing a centralized on–line monitoring and prognostic analysis system to identify adverse trends with early warning technology which compares relative parameters with that of conditions derived from previous experienced patterns of abnormal conditions. (author)
Additional details
Identifiers
Publishing Information
- Publisher
- IAEA
- Imprint Place
- Vienna (International Atomic Energy Agency (IAEA))
- ISBN
- 978-92-0-110916-3
- Imprint Title
- Maintenance Optimization Programme for Nuclear Power Plants. Companion CD-ROM
- Imprint Pagination
- [1 CD-ROM]
- Journal Issue
- no. NP-T-3.8
- Series
- IAEA Nuclear Energy Series
- Journal Page Range
- p. 45-57
- ISSN
- 1995-7807
INIS
- Country of Publication
- International Atomic Energy Agency (IAEA)
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 49057992
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S42: ENGINEERING;
- Descriptors DEI
- COMPARATIVE EVALUATIONS; COST; EQUIPMENT; FAILURES; FORECASTING; IMPLEMENTATION; INFRARED THERMOGRAPHY; LIFETIME EXTENSION; LUBRICATING OILS; MECHANICAL VIBRATIONS; NUCLEAR POWER PLANTS; ON-LINE CONTROL SYSTEMS; OPTIMIZATION; REACTOR MAINTENANCE; REPUBLIC OF KOREA; ULTRASONIC TESTING; WORKING CONDITIONS
- Descriptors DEC
- ACOUSTIC TESTING; ASIA; CONTROL SYSTEMS; DEVELOPING COUNTRIES; EVALUATION; LIFETIME; LUBRICANTS; MAINTENANCE; MATERIALS TESTING; MEASURING METHODS; NONDESTRUCTIVE TESTING; NUCLEAR FACILITIES; OILS; ON-LINE SYSTEMS; OPERATION; ORGANIC COMPOUNDS; OTHER ORGANIC COMPOUNDS; PETROLEUM PRODUCTS; POWER PLANTS; REACTOR LIFE CYCLE; REACTOR OPERATION; SERVICE LIFE; TESTING; THERMAL POWER PLANTS; THERMOGRAPHY
Optional Information
- Notes
- Refs., figs., tabs.
- Secondary number(s)
- STI/PUB--1757(COMPANION CD-ROM)