Published 1975
| Version v1
Report
Restricted
Electrical load forecastes and correlations with economic growth
Description
Normally, an increase in productivity, which is commonly considered necessary for maintaining the economic position of an economic area, will result in increased demands for energy. This additional requirement must be taken into account, and this is what the capacities of power-generating facilities have to be adapted to. Thus, capital expenditures are necessary the extent of which will depend upon future development. At this point, prognostication is to help avoid misemployment of funds. Such energy prognostication is definitely needed for a period of time corresponding to the construction period for power-generating installations, hence for some five to ten years. (orig.)
Availability note (English)
MF available from INIS under the Report Number.Abstract (German)
Wachsende Produktivitaet, die ueblicherweise als notwendig zur Erhaltung der wirtschaftlichen Stellung eines Gebietes betrachtet wird, fuehrt zu einer Zunahme des Energiebedarfs. Diese Zunahme muss in die Berechnungen mit einbezogen werden, und die Kapazitaeten der Kraftwerke sind daran anzupassen. Dazu ist ein Kapitalaufwand notwendig, dessen Ausmass von der weiteren Entwicklung abhaengig sein wird. An diesem Punkt kann die Erstellung von Prognosen die Fehlleitung von Geldern verhindern. Energieprognosen dieser Art sind dringend notwendig fuer einen Zeitraum, der dem Bau eines Kraftwerks entspricht, d.h. einen Zeitraum von ca. 5-10 Jahren. (orig.)
Files
Additional details
Publishing Information
- Imprint Pagination
- 34 p.
- Report number
- AED-Conf--75-769-018
Conference
- Title
- IAEA interregional training course on nuclear power project planning and implementation.
- Dates
- 8 Sep 1975.
- Place
- Karlsruhe, F.R. Germany.
INIS
- Country of Publication
- Germany
- Country of Input or Organization
- Germany
- INIS RN
- 7275993
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COST; ECONOMICS; ELECTRIC POWER; FINANCING; FORECASTING; NUCLEAR POWER; PLANNING; POWER DEMAND
- Descriptors DEC
- POWER
Optional Information
- Notes
- 8 figs.; 7 refs.