Integrated risk management of safety and development on transportation corridors
Creators
- 1. Department of Management, Robins School of Business, University of Richmond, 1 Gateway Road, Richmond, VA 23173 (United States)
- 2. Center for Risk Management of Engineering Systems, Research Professor, Department of Systems and Information Engineering, University of Virginia, PO Box 400747, 112C Olsson Hall, 151 Engineers Way, Charlottesville, VA 22904 (United States)
Description
Prioritization of investments to protect safety and performance of multi-regional transportation networks from adjacent land development is a key concern for infrastructure agencies, land developers, and other stakeholders. Despite ample literature describing relationships between transportation and land use, no evidence-based methods exist for monitoring corridor needs on a large scale. Risk analysis is essential to the preservation of system safety and capacity, including avoidance of costly retrofits, regret, and belated action. This paper introduces the Corridor Trace Analysis (CTA) for prioritizing corridor segments that are vulnerable to adjacent land development. The method integrates several components: (i) estimation of likelihood of adjacent land development, using influence diagram and rule-based modeling, (ii) characterization of access point density using geospatial methods, and (iii) plural-model evaluation of corridors, monitoring indices of land development likelihood, access point densities, and traffic volumes. The results inform deployment of options that include closing access points, restricting development, and negotiation of agencies and developers. The CTA method is demonstrated on a region encompassing 6000 centerline miles (about 10,000 km) of transportation corridors. The method will be of interest to managers investing in safety and performance of infrastructure systems, balancing safety, financial, and other criteria of concern for diverse stakeholders. - Highlights: • The Corridor Trace Analysis (CTA) method for prioritizing transportation corridors. • The CTA method studies corridors vulnerable to adjacent land development. • The CTA method quantifies the influence of risk scenarios on agency priorities. • The CTA method is demonstrated on 6000 miles of critical transportation corridor
Availability note (English)
Available from http://dx.doi.org/10.1016/j.ress.2014.11.015Additional details
Identifiers
- DOI
- 10.1016/j.ress.2014.11.015;
- PII
- S0951-8320(14)00297-X;
Publishing Information
- Journal Title
- Reliability Engineering and System Safety
- Journal Volume
- 138
- Journal Page Range
- p. 1-12
- ISSN
- 0951-8320
- CODEN
- RESSEP
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 47019556
- Subject category
- S42: ENGINEERING;
- Descriptors DEI
- CAPITALIZED COST; DENSITY; GEOGRAPHIC INFORMATION SYSTEMS; LAND USE; LEGISLATION; PLANNING; RISK ASSESSMENT; SAFETY ANALYSIS; SIMULATION; SITE SELECTION; SUSTAINABLE DEVELOPMENT
- Descriptors DEC
- COST; INFORMATION SYSTEMS; PHYSICAL PROPERTIES; RESOURCE DEVELOPMENT