Radiological aspects of a full-system decontamination of Loviisa 2

  • 1. Loviisa Nuclear Power Plant (Finland)

Description

A full-system decontamination (FSD) of Loviisa-2 was performed in ten days during the annual refuelling outage 1994. This was the first time on entire primary circuit, including all steam generators and the reactor vessel with internals was decontaminated in a PWR in a Western country. The results were very satisfying. (author)

Part of:
The status on contamination monitoring in Thailand

Additional details

Publishing Information

Publisher
British Nuclear Energy Society.
Imprint Place
London (United Kingdom)
ISBN
0 7277 2087 2
Imprint Title
Radiation dose management in the nuclear industry. Proceedings
Imprint Pagination
251 p.
Journal Page Range
p. 130-135.

Conference

Title
Conference on radiation dose management in the nuclear industry.
Dates
9-11 Oct 1995.
Place
Windermere, Cumbria (United Kingdom).

Optional Information