Kozloduy NPP units 3 and 4 rest life time program execution

Creators

  • 1. Kozloduy NPP Plc., Kozloduy (Bulgaria)

Description

In this paper the following tasks are considered: Kozloduy NPP units 3 and 4 life time evaluation; programme for the units life time assuring; units 3 and 4 renewals. The main activities for the programme implementation are described and the obtained results are presented. In conclusion, the executed activities of program for assuring the life time of units 3 and 4 of Kozloduy NPP, cogently prove that the lifetime of structures, systems and components, is assured duly and those structures, systems and components will be in service safely, economically effectively and mostly reliable till the end of the 30 years design lifetime. For some of them it has been proved even for 35 and 40 years. Program activities continue during 2005, although the early shutdown of units 3 and 4 is possible

Availability note (English)

Available from INIS in electronic form

Files

37038486.pdf

Files (1.6 MB)

Name Size Download all
md5:f1ca40a2ab31e4136112d3de1f7a73aa
1.6 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
32 p.
Report number
INIS-BG--1034

Conference

Title
The Future of Nuclear Energy on the Balkans: Security of Energy Supply and Nuclear New Builds
Acronym
BULATOM International Nuclear Forum
Dates
15-18 Jun 2005
Place
Varna (Bulgaria)

Optional Information

Notes
19 figs., 1 tab.