Published October 22, 1968 | Version v1
Report Restricted

2nd / 3rd Avr Refill Batch, Acceptance Report III, 1, Uncoated and Coated Particles (II / Up / S1; II / Bp / S1; II / Bp / S2)

Description

Automatic translation: The fuel elements of the 2nd AVR refill batch should be wallpapered. Because of the unfavourable radiation behaviour, pressed fuel elements should be produced. As the particles were partially produced and tested, the criterion for the specification of acceptance of particles remained chapters 4 and 5 for the 2nd AVR refill batch from August 1968. The fuel elements are then tested according to the specification for the pressed elements.

Abstract (German)

Die Brennelemente der 2. AVR-Nachfüllcharge sollten Tapeten elemente sein. Wegen des ungünstigen Bestrahlungsverhaltens sollten jedoch gepresste Brennelemente hergestellt werden. Da die Partikeln teilweise hergestellt und geprüft waren, blieb als Kriterium für die Abnahme der Partikeln die Spezifikation für die 2. AVR-Nachfüllcharge vom August 1968, Kap.4 und 5 bestehen. Die Brennelemente werden dann nach der Spezifikation fuer die gepressten Elemente geprueft

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Original title (German)
2./3. AVR-Nachfüllcharge Abnahmebericht III, 1 Unbeschichtete und beschichtete Partikeln (II/UP/S1; II/BP/S1; II/BP/S2)

Publishing Information

Imprint Pagination
246 p.
Report number
INIS-DE--21E0008

Optional Information

Notes
Document from Juelich Preservation Project; Figs., tabs.