Published October 1994 | Version v1
Report Open

ECN experiments in the HAW project. Liner A1 deformation measurements

Description

In borehole A1 in the Arse salt mine special instrumentation is installed to measure the liner tube deformation caused by salt pressure. Two types of instrument are used. They are called by the names of their chief-constructers. The so called KOOTER unit is used to learn the salt pressure on the liner tube and a HOEKSTRA unit to obtain the liner ovality. Data obtained from these instruments are analyzed. (orig./HP)

Availability note (English)

MF available from INIS under the Report Number.

Files

27011409.pdf

Files (1.2 MB)

Name Size Download all
md5:77bbb3cf31c025c1abe2d704dd7b3714
1.2 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
48 p.
Report number
ECN-I--94-029

INIS

Country of Publication
Netherlands
Country of Input or Organization
Netherlands
INIS RN
27011409
Subject category
S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
Descriptors DEI
ASSE SALT MINE; BOREHOLES; DEFORMATION; HEATING; LINERS
Descriptors DEC
CAVITIES; MINES; NUCLEAR FACILITIES; RADIOACTIVE WASTE FACILITIES; UNDERGROUND FACILITIES

Optional Information