Published October 1994
| Version v1
Report
Open
ECN experiments in the HAW project. Liner A1 deformation measurements
Description
In borehole A1 in the Arse salt mine special instrumentation is installed to measure the liner tube deformation caused by salt pressure. Two types of instrument are used. They are called by the names of their chief-constructers. The so called KOOTER unit is used to learn the salt pressure on the liner tube and a HOEKSTRA unit to obtain the liner ovality. Data obtained from these instruments are analyzed. (orig./HP)
Availability note (English)
MF available from INIS under the Report Number.Files
27011409.pdf
Files
(1.2 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:77bbb3cf31c025c1abe2d704dd7b3714
|
1.2 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 48 p.
- Report number
- ECN-I--94-029
INIS
- Country of Publication
- Netherlands
- Country of Input or Organization
- Netherlands
- INIS RN
- 27011409
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- ASSE SALT MINE; BOREHOLES; DEFORMATION; HEATING; LINERS
- Descriptors DEC
- CAVITIES; MINES; NUCLEAR FACILITIES; RADIOACTIVE WASTE FACILITIES; UNDERGROUND FACILITIES
Optional Information
- Contract/Grant/Project number
- Contract CEC F12W-0002-C(MB)
- Funding organization
- Commission of the European Communities, Brussels (Belgium).