Published October 2016 | Version v1
Miscellaneous

Review of Impact Factors on Decommissioning Strategies

  • 1. KHNP CRI, Daejeon (Korea, Republic of)

Description

This article is prepared to factor out decommissioning strategies mostly appropriate to the decommissioning Kori-1 nuclear power plant. Terms used to delineate the lifetime of an authorized facility and of the associated licensing process consists of six core stages such as siting, design, construction, commissioning, operation and decommissioning. The term decommissioning implies the administrative and technical actions taken to allow the removal of some or all of the regulatory controls from a facility except for the part of a disposal facility in which the radioactive waste is emplaced. Whole range of each process of decommissioning should be considered throughout the other five stages. The decommissioning process is typically composed of its planning, conducting actions and terminating the authorization. In order to achieve the successful decommissioning, the impact factor on the strategy should be analyzed and evaluated to optimally apply to Kori-1 project. From my perspective, among eight factor, stakeholder's consideration and spent fuel management are considered the key elements we have to concentrate on to smoothly go ahead for successful decommissioning of Kori-1

Part of:
Proceedings of the KNS 2016 Autumn Meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS 2016 Autumn Meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[3 p.]

Conference

Title
2016 Autumn Meeting of the KNS
Dates
26-28 Oct 2016
Place
Kyungju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
48067291
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
CONTROL; KORI-1 REACTOR; LICENSING; LIFETIME; PLANNING; REACTOR DECOMMISSIONING; REMOVAL; SPENT FUELS
Descriptors DEC
DECOMMISSIONING; ENERGY SOURCES; ENRICHED URANIUM REACTORS; FUELS; MATERIALS; NUCLEAR FUELS; POWER REACTORS; PWR TYPE REACTORS; REACTOR LIFE CYCLE; REACTOR MATERIALS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
3 refs, 1 tab