Published 2014 | Version v1
Miscellaneous

SuperKEKB main ring tunnel motion

  • 1. High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)

Description

Effects of the construction of new facility buildings along the SuperKEKB tunnel are reported. The tunnel level changes due to the newly excavated tunnel for the KEK PF-AR injector, which are continuously monitored by the SuperKEKB HLS (Hydrostatic Leveling Sensor) system, are also shown. The SuperKEKB tunnel motion due to such heavy construction is summarized, along with the effects of the uncontrolled tunnel temperature on magnet alignment. (author)

Part of:
Proceedings of the 11th annual meeting of Particle Accelerator Society of Japan

Additional details

Publishing Information

Imprint Title
Proceedings of the 11th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
[1393 p.]
Journal Page Range
[5 p.]

Conference

Title
11. annual meeting of Particle Accelerator Society of Japan
Dates
8-12 Aug 2014
Place
Aomori (Japan)

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
47011325
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; AUGMENTATION; BEAM LUMINOSITY; BEAM TRANSPORT; CONSTRUCTION; ELECTRON-POSITRON COLLISIONS; GEV RANGE 01-10; KEK PHOTON FACTORY; MOTION; SHAFT EXCAVATIONS; STORAGE RINGS; TEST FACILITIES; TUNNELS
Descriptors DEC
COLLISIONS; ELECTRON COLLISIONS; ENERGY RANGE; GEV RANGE; POSITRON COLLISIONS; RADIATION SOURCES; SYNCHROTRON RADIATION SOURCES; UNDERGROUND FACILITIES

Optional Information

Notes
6 refs., 12 figs., 1 tab.