Published August 1985 | Version v1
Report Restricted

Closeout of IE Bulletin 81-01: surveillance of mechanical snubbers

Description

In this period from August 1974 to May 1980, failures of mechanical snubbers were described in event reports issued for nine facilities and in a NRC/IE study of the DOE Fast Flux Test Facility. In most failures, the snubbers were frozen and would not permit free piping motions during thermal transients. In some cases, the failed snubbers no longer provided seismic shock restraint. Because of concern about the reported failures of mechanical snubbers, standard technical specification revisions for snubber surveillance were issued by NRC/DL on November 20, 1980. IE Bulletin 81-01 was issued January 27, 1981 to require examination and testing of mechanical snubbers in safety-related systems at licensed facilities and at selected facilities under construction. Evaluation of utility responses and NRC/IE inspection reports indicates that the bulletin can be closed out per specific criteria for 73 (95%) of the 77 facilities to which it was issued for action. Followup items are proposed for use by NRC/IE to ensure satisfactory completion of corrective action at the remaining four facilities

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A04/MF A01 - GPO as TI85902056.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
65 p.
Report number
NUREG/CR--4006

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
17028347
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Descriptors DEI
DEFECTS; FAILURES; MONITORING; NUCLEAR POWER PLANTS; REACTORS; SHOCK ABSORBERS; SPECIFICATIONS; US NRC
Descriptors DEC
NATIONAL ORGANIZATIONS; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS; US ORGANIZATIONS