Published October 1979 | Version v1
Report Restricted

Fabrication and loading of long-term stress corrosion cracking surveillance specimens for the Dresden 1 decontamination program

Description

Stress-corrosion cracking test specimens were prepared for Dow Nuclear Services for insertion in the Dresden 1 reactor during the chemical decontamination of the primary system, and for subsequent exposure under operating conditions when the station returns to service. The specimens consist of pressurized tubes fabricated from Type-304 and -304L stainless steel, Inconel 600, Incoloy 800, and Zircaloy 2. In addition, constant radius bent-beam specimens of 3/4 hard Type-410 stainless steel were also included. All specimens were stressed to, or slightly above, their respective 0.2% offset yield strengths at the temperatures of interest

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A04/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
66 p.
Report number
COO--4014-T1