Study of a conceptual nuclear energy center at Green River, Utah. Final summary report

Description

This document summarizes a conceptual study on the feasibility and practicality of developing a nuclear energy center (NEC) at a representative Western site. The site selected for this conceptual study, an area of about 50 square miles, is located 15 miles south of Green River, Utah. The conceptual NEC would consist of nine nuclear electric generating units, arranged on the site in three clusters of three reactors each (triads), separated by about 2 1/2 miles. Of the total electric output of 11,250 MWe that the NEC could produce, about 82% is assumed to be transmitted out of Utah to Colorado, New Mexico, Arizona, Nevada, and California. The technical engineering issues studied included geology and seismology, plant design, low-level radioactive waste disposal, transmission, and construction schedules and costs. Socioeconomic issues included were demographics, land use, community service needs, and fiscal impacts. Environmental considerations included terrestrial and aquatic ecology, visual impact, and secondary population impacts. Radiological issues were concerned with the safety and risks of an NEC and an on-site low-level waste facility. Institutional issues included methods of ownership, taxation, implications of energy export, and water allocation. The basic finding was that an NEC would be technically feasible, but a number of socioeconomic and institutional issues would require resolution before a Western regional NEC could be considered a viable power plant siting option

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A11/MF A01; 1 as DE83005991.

Files

14761451.pdf

Files (5.6 MB)

Name Size Download all
md5:1f5c525d5cca06a4b033fe7ea9165bab
5.6 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
238 p.
Report number
ORNL/Sub--7846/1