Published 1988 | Version v1
Report Restricted

TORE SUPRA graphite inner first wall

Description

TORE SUPRA is a fairly large tokamak and has an original goal to withstand a large power removal (25 MW) during a 30 seconds long pulse. One of the main energy removal system's is the inner first wall which was originally designed for the following aims: protect the inner side of the vacuum vessel from normal plasma operation (participates to the plasma power removal) and against disruptive events (plasma energy quench and current decay); act as a toroidal belt limiter during steady state operation and plasma start up; and protect the vacuum vessel from the shine through of the neutral beam injectors and act as a beam dump for short shots. In order to match those different goals the design choice was oriented towards an actively cooled graphite wall capable to sustain an 1 MW/m2 continuous heat flux. This paper discusses this design concept further

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 - OSTI; 1 as DE89009325.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
4 p.
Report number
SAND--89-0670C

Conference

Title
15. symposium on fusion technology.
Dates
19-23 Sep 1988.
Place
Utrecht (Netherlands).

Optional Information

Notes
Portions of this document are illegible in microfiche products.
Secondary number(s)
CONF-880929--11.