Westinghouse AP 1000 program status
Description
The project 1000 is presented and features are discussed in the paper. Design maturity is characterized by 1300 man-year / $400 million design and testing effort, more than 12 000 design documents completed; 3D computer model developed. It includes structures, equipment, small / large pipe, cable trays, ducts etc. Licensing Maturity is determined by a very thorough and complete NRC review of AP600; 110 man-year effort (NRC) over 6 years, $30 million; independent, confirmatory plant analysis; independent, confirmatory plant testing (ROSA, OSU); over 7400 questions answered, no open items; over 380 meeting with NRC, 43 meetings with ACRS. NRC Design Certification is issued in December 1999. Reasons for developing AP 1000 and design changes are presented. Economic analysis shows an expectation for payback within 20 years. AP1000 provides 75% power uprate for 15% increment in capital cost. AP1000 meets new plant economic targets in the near term
Availability note (English)
Available from INIS in electronic formFiles
33070706.pdf
Files
(1.2 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:3c987f8a715d95dd3c99f0c86e064284
|
1.2 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 16 p.
- Report number
- INIS-BG--0456
Conference
- Title
- Options, Challenges and Future'
- Acronym
- International Nuclear Forum 'Nuclear Power in Eastern Europe
- Dates
- 28-30 Jun 2002
- Place
- Varna (Bulgaria)
INIS
- Country of Publication
- Bulgaria
- Country of Input or Organization
- Bulgaria
- INIS RN
- 33070706
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- DESIGN; ECONOMIC ANALYSIS; NUCLEAR POWER PLANTS; POWER GENERATION; REACTOR LICENSING
- Descriptors DEC
- ECONOMICS; LICENSING; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Notes
- 7 figs., 1 tab.