Published December 16, 1994 | Version v1
Report Open

45-Day safety screening for Tank 241-C-103 push mode sample, riser 2

Description

This is the 45-Day report for the Tank 241-C-103 (C-103) push-mode core sampling characterization effort. Problems encountered with the push-mode sampling truck following removal of the first segment from riser 2 resulted in a long delay before resumption of sampling, therefore it was decided to begin the 45-day clock and issue a report based on receipt of this first segment. If subsequent segments are removed from tank C-103, a revision of this report or a new report will be issued to include any new data. Included are copies of the differential scanning calorimetry (DSC) and thermogravimetric analysis (TGA) scans as requested in Reference 1. Also included is a copy of any immediate notification documentation. Other pertinent documentation will be included in the C-103 216-day report

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95005057; NTIS; US Govt. Printing Office Dep.

Files

26041515.pdf

Files (652.2 kB)

Name Size Download all
md5:9d06566ec56915b07a23b07900cf5821
652.2 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
17 p.
Report number
WHC-SD--WM-DP-080

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).