Published March 2000 | Version v1
Report Open

Design of neutral beam injection power supplies for ITER

  • 1. Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment
  • 2. Toshiba Corp., Kawasaki, Kanagawa (Japan)
  • 3. Hitachi Ltd., Tokyo (Japan)

Description

Design study on a power supply system for the ITER neutral beam injector(NBI) has been performed. Circuits of converter/inverter system and other components of the acceleration power supply whose capacity is 1 MV, 45 A have been designed in detail. Performance of the negative ion production power supplies such as an arc and an extraction power supplies was investigated using the EMTDC code. It was confirmed that ripples of 0.34%p-p for the extraction power supply and 1.7%p-p for the arc power supply are small enough. It was also confirmed that an energy input to a negative ion generator from the arc power supply at an arcing can be suppressed smaller than 8 J. The extraction power supply was designed to suppress the energy input lower than 13 J at the breakdown in the extractor. These performances satisfy the required specification of the power supply system. (author)

Availability note (English)

Available from INIS in electronic form

Files

31040886.pdf

Files (1.5 MB)

Name Size Download all
md5:1483b39fd52a01a6625b3c62d5999e96
1.5 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
80 p.
Report number
JAERI-Tech--2000-033

Optional Information

Notes
3 refs., 36 figs., 11 tabs.