Description

Highlights: • A critical challenge of district heating systems in summer is addressed. • A multiobjective genetic algorithm is used to analyze the system. • In summer, the velocity of hot water reaches the appropriate value of 0.8 m/s. • At least, 78 tonnes more waste will be burnt per day. • The Levelized cost of cooling production would decrease by 10%. A critical challenge of some district heating systems is too low summer demand, which results in a too low temperature at the consumption points. To prevent this large temperature drop along the path, the heat production plants have to oversupply hot water to the pipeline, which is itself problematic techno-economically. One more challenge of summer supply, if supplied by waste incineration plants, is that due to the low heating demand during the summer, there will be too much useless excess municipal solid waste at the disposal, causing further technical and economic issues. In the proposed concept of this study, an integrated district heating/cooling system is proposed to address both of these problems. For this, a solar-assisted chiller is utilized to not only take advantage of the excess waste of the power plant but also the excess hot water injected into the pipeline for cold supply. The research question is about the optimal sizing of the system. The sizing of the components of the system is carried out via a rigorous multiobjective genetic algorithm work package covering technical, economic, and environmental objectives, and then, the optimal design is techno-economic-environmentally analyzed. In summer, the velocity of hot water reaches the appropriate value of 0.8 m/s, and following the cold load supply, 67.8 kg/s extra mass flow rate of hot water with a temperature over 80 ℃ could feed the district heating system. Besides, at least 78 tonnes more waste will be burnt per day. It means challenges of the high amount of waste disposal, low velocity of hot water in district heating pipeline, and the high amount of waste heat will be solved, and the levelized cost of cooling production would decrease by 10%.

Availability note (English)

Available from http://dx.doi.org/10.1016/j.enconman.2021.113985

Additional details

Identifiers

DOI
10.1016/j.enconman.2021.113985;
PII
S0196890421001618;

Publishing Information

Journal Title
Energy Conversion and Management
Journal Volume
236
Journal Page Range
vp.
ISSN
0196-8904
CODEN
ECMADL

Optional Information

Copyright
Copyright (c) 2021 Elsevier Ltd. All rights reserved.