Published 2019 | Version v1
Journal article

Needs of countries with longer timescale for deep geological repository implementation

Creators

  • 1. Strategical and Technical Directorate, PURAM, HRSZ.: 8803/2, 7031 Paks (Hungary)

Description

Countries operating nuclear power plants have to deal with the tasks connected to spent fuel and high-level radioactive waste management. There is international consensus that, at this time, deep geological disposal represents the safest and most sustainable option as the end point of the management of high-level waste and spent fuel considered as waste. There are countries with longer timescale for deep geological repository (DGR) implementation, meaning that the planned date of commissioning of their respective DGRs is around 2060. For these countries cooperation, knowledge transfer, participation in research and development programmes (like EURAD) and adaptation of good international practice could help in implementing their own programmes. In the paper the challenges and needs of a country with longer implementation timescale for DGR will be introduced through the example of Hungary. (author)

Availability note (English)

Available from doi: http://dx.doi.org/10.1051/epjn/2019042

Additional details

Identifiers

Publishing Information

Journal Title
EPJ Nuclear Sciences and Technologies
Journal Volume
6
Journal Page Range
p. 22.1-22.7
ISSN
2491-9292

Optional Information

Notes
7 refs.