Published June 1982 | Version v1
Report Restricted

Environmental radioactivity levels, Bellefonte Nuclear Plant, annual report for 1981

Description

The Bellefonte Nuclear Plant (BLN), being constructed by the Tennessee Valley Authority, is located in Jackson County, Alabama, on a peninsula bounded on the west by Town Creek embayment and on the east by Guntersville Reservoir at Tennessee River Mile (TRM) 391.5. The site is approximately 6 miles (10 kilometers) northeast of Scottsboro, Alabama. The plant will consist of two pressurized water reactors; each unit is rated at 3620 MWt and 1271 MWe. Fuel load in Unit 1 is scheduled for no earlier than 1983. A preoperational environmental radiological monitoring program was implemented in August 1978. This program has the objective of establishing a baseline of data on the distribution of natural and manmade radioactivity in the environment near the plant site. This report presents the results obtained from that program during 1981

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A03/MF A01 as DE82904382.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
49 p.
Report number
TVA/OMS/OHS--82/10

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
14732128
Subject category
S61: RADIATION PROTECTION AND DOSIMETRY; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Numerical Data, Progress Report
Descriptors DEI
BELLEFONTE-1 REACTOR; BELLEFONTE-2 REACTOR; COMPILED DATA; RADIATION MONITORING; RADIOISOTOPES; REACTOR SITES
Descriptors DEC
DATA; ENRICHED URANIUM REACTORS; INFORMATION; ISOTOPES; MONITORING; NUMERICAL DATA; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS