Published 1980 | Version v1
Report Open

Water chemistry of nuclear power plant

Description

An analysis and evaluation were made on the data connected with secondary water chemistry at Kori no. 1 power plant from Jan. to Sep. 1979. All water control parameters were satisfied with the value recommended by Westinghouse. But judging from the frequent inleakages of sea water through condenser and sludge composition, there are some possibilities that denting at Kori no. 1 power plant would increase. It seems that boric acid soaking and injection into steam generator are effective to arrest denting, but potential adverse effects on the boric acid treatment should be evaluated. It is also important to consider, as a corrective action for denting, installing polishing plant, retubing the present condenser with titanium, and performing chemical cleaning and periodical water soaking. The eddy current testing results, obtained in No. 1979, showed that the denting was greatly reduced in comparison with 1978's. (author)

Availability note (English)

MF available from INIS under the Report Number.

Files

12588665.pdf

Files (3.4 MB)

Name Size Download all
md5:770a3feadbcccf169740baf446fcb86b
3.4 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
76 p.
Report number
KAERI--423/RR-156/80