Published December 1975 | Version v1
Report Restricted

Nuclear powered tanker. Maritime design study for 600,000 DWT nuclear tanker. Volume 1. Preliminary specifications (Mod 1). Final report

Description

The study extended over a period of approximately six months. The principal objectives of the study were to develop the preliminary design for a 600,000 DWT nuclear powered ULCC, perform ship safety analyses, develop a preliminary quality assurance program, develop a ship construction schedule of key events, develop the shipyard/reactor manufacturer scope of supply, define the interfaces specifically related to the nuclear propulsion plant. In terms of budgetary estimates, an economic evaluation was performed for ship construction cost, ship refueling and drydocking cost, first of a kind ship construction cost, ship manning cost, and contingencies. Additionally, recommendations are made as a result of the ship safety studies

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS. PC A22/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
505 p.
Report number
PB--269723

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
9383825
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Descriptors DEI
NUCLEAR MERCHANT SHIPS; SHIPS; SPECIFICATIONS
Descriptors DEC
NUCLEAR SHIPS