Published January 9, 1995
| Version v1
Report
Open
BCP selector valves and limit switches
Description
This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Electrical/Instrumentation systems for the BCP stream function as required by project criteria. Specifically, the test will verify the operation of the solenoid valves and associated limit switches installed for the BCP portion of W-OO7H. This equipment is part of the B-Plant Process Condensate Treatment Facility
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE95005650; NTIS; US Govt. Printing Office Dep.Files
26042033.pdf
Files
(536.1 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:8fb4846027fbb37f7ed64a34657e27a5
|
536.1 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 13 p.
- Report number
- WHC-SD--W007H-ATR-001
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26042033
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- CONDENSATES; HANFORD RESERVATION; LIMITING VALUES; PERFORMANCE TESTING; RADIOACTIVE WASTE FACILITIES; RADIOACTIVE WASTE PROCESSING; SWITCHES; VALVES
- Descriptors DEC
- CONTROL EQUIPMENT; ELECTRICAL EQUIPMENT; EQUIPMENT; FLOW REGULATORS; MANAGEMENT; NATIONAL ORGANIZATIONS; NUCLEAR FACILITIES; TESTING; US DOE; US ORGANIZATIONS; WASTE MANAGEMENT; WASTE PROCESSING
Optional Information
- Contract/Grant/Project number
- Contract AC06-87RL10930
- Funding organization
- USDOE, Washington, DC (United States).