Published January 9, 1995 | Version v1
Report Open

BCP selector valves and limit switches

Description

This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Electrical/Instrumentation systems for the BCP stream function as required by project criteria. Specifically, the test will verify the operation of the solenoid valves and associated limit switches installed for the BCP portion of W-OO7H. This equipment is part of the B-Plant Process Condensate Treatment Facility

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95005650; NTIS; US Govt. Printing Office Dep.

Files

26042033.pdf

Files (536.1 kB)

Name Size Download all
md5:8fb4846027fbb37f7ed64a34657e27a5
536.1 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
13 p.
Report number
WHC-SD--W007H-ATR-001

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).