Published 2008 | Version v1
Miscellaneous

Present status of RF source operation at J-PARC linac

  • 1. Japan Atomic Energy Agency, Tokai, Ibaraki (Japan)
  • 2. High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan)

Description

The J-PARC LINAC RF source executed operation corresponding to the beam commission for RCS, MLF, and MR from the phase of Run no.9(Sep.2007) to Run no.17(Jun.2008). The RF source has been operating well in the condition of 25Hz repetition, 650μs RF width and 1.4MW maximum power. The total operation time has been reached to 3000 hours. Maintenance work was chiefly executed the high-voltage power supply relation, and aimed at the decrease at the downtime. In this paper, we will report the status of RF source operation and the maintenance activity. (author)

Part of:
Proceedings of the 5th annual meeting of Particle Accelerator Society of Japan and the 33rd Linear Accelerator Meeting in Japan

Additional details

Additional titles

Original title (Japanese)
Dai 5 kai nippon kasokuki gakkai nenkai. Dai 33 kai riniakku gijutsu kenkyukai

Publishing Information

Imprint Title
Proceedings of the 5th annual meeting of Particle Accelerator Society of Japan and the 33rd Linear Accelerator Meeting in Japan
Imprint Pagination
986 p.
Journal Page Range
p. 485-487

Conference

Title
5. annual meeting of Particle Accelerator Society of Japan; 33. Linear Accelerator Meeting in Japan
Dates
6-8 Aug 2008
Place
Higashi-Hiroshima, Hiroshima (Japan)

Optional Information

Notes
This CD-ROM can be used for WINDOWS, MACINTOSH; Acrobat Reader is included; Data in PDF format, Folder Name: PDF, Paper ID: WP084.pdf; 3 refs., 4 figs., 2 tabs. Imprint:Dai 5 kai nippon kasokuki gakkai nenkai. Dai 33 kai riniakku gijutsu kenkyukai