Published September 1978 | Version v1
Report Restricted

The KNK II test program

Description

The sodium cooled fast reactor KNK II in the Research Center of Karlsruhe with a thermal power of 58 MW and an electric power of 20 MW has the mission to collect experience for the construction and operation of the German fast breeder prototype SNR 300. First criticality of the reactor was reached on October 10, 1977 and the license for full-power operation was given on August 3, 1978. The test program for KNK II comprises the following areas: irradiation experiments with the corresponding post-irradiation examination, fuel cycle, instrumentation and detection techniques, operation related experiments and reactor chemistry. These areas with their specific experimental programs are described in the report, after an illustration of the properties of KNK II as an irradiation reactor

Availability note (English)

Available from INIS in electronic form

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Original title (German)
Das KNK II Versuchsprogramm

Publishing Information

Imprint Pagination
122 p.
Report number
KFK-PSB--01.01.04P00A

Optional Information

Notes
refs, tabs, figs
Secondary number(s)
INIS-DE-PSB--050