Conversion of dependability deterministic requirements into probabilistic requirements
Description
This report concerns the on-going survey conducted jointly by the DAM/CCE and NRE/SR branches on the inclusion of dependability requirements in control and instrumentation projects. Its purpose is to enable a customer (the prime contractor) to convert into probabilistic terms dependability deterministic requirements expressed in the form ''a maximum permissible number of failures, of maximum duration d in a period t''. The customer shall select a confidence level for each previously defined undesirable event, by assigning a maximum probability of occurrence. Using the formulae we propose for two repair policies - constant rate or constant time - these probabilized requirements can then be transformed into equivalent failure rates. It is shown that the same formula can be used for both policies, providing certain realistic assumptions are confirmed, and that for a constant time repair policy, the correct result can always be obtained. The equivalent failure rates thus determined can be included in the specifications supplied to the contractors, who will then be able to proceed to their previsional justification. (author), 8 refs., 3 annexes
Availability note (English)
MF available from INIS under the Report Number.Files
25010586.pdf
Files
(678.5 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:ff6f2a7895280161e5a625f01c246075
|
678.5 kB | Preview Download |
Additional details
Additional titles
- Original title (French)
- Traduction d'exigences deterministes de surete de fonctionnement en exigences probabilistes
Publishing Information
- Imprint Pagination
- 45 p.
- Report number
- EDF--93-NJ-00041
INIS
- Country of Publication
- France
- Country of Input or Organization
- France
- INIS RN
- 25010586
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- PROBABILISTIC ESTIMATION; PWR TYPE REACTORS; REACTOR CONTROL SYSTEMS; REACTOR OPERATION; REPORTING REQUIREMENTS
- Descriptors DEC
- CONTROL SYSTEMS; ENRICHED URANIUM REACTORS; OPERATION; POWER REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS