Published December 1994
| Version v1
Report
Open
Testing and development strategy for the tank waste remediation system
Description
This document provides a strategy for performing radioactive (hot) and nonradioactive testing to support processing tank waste. It evaluates the need for hot pilot plant(s) to support pretreatment and other processing functions and presents a strategy for performing hot test work. A strategy also is provided for nonradioactive process and equipment testing. The testing strategy supports design, construction, startup, and operation of Tank Waste Remediation System (TWRS) facilities
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE95005619; NTIS; US Govt. Printing Office Dep.Files
26045374.pdf
Files
(2.0 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:d50abe553b1e4d8828aa9d578b7a6e1f
|
2.0 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 74 p.
- Report number
- WHC-SD--WM-SP-006
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26045374
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- CHEMICAL WASTES; DESIGN; HANFORD RESERVATION; HIGH-LEVEL RADIOACTIVE WASTES; LOW-LEVEL RADIOACTIVE WASTES; MATERIALS HANDLING EQUIPMENT; PERFORMANCE TESTING; RADIOACTIVE WASTE MANAGEMENT; REMEDIAL ACTION; TANKS; TECHNOLOGY ASSESSMENT; VITRIFICATION; WASTE DISPOSAL; WASTE PROCESSING
- Descriptors DEC
- CONTAINERS; EQUIPMENT; MANAGEMENT; MATERIALS; NATIONAL ORGANIZATIONS; NONRADIOACTIVE WASTES; RADIOACTIVE MATERIALS; RADIOACTIVE WASTES; TESTING; US DOE; US ORGANIZATIONS; WASTE MANAGEMENT; WASTES
Optional Information
- Contract/Grant/Project number
- Contract AC06-87RL10930
- Funding organization
- USDOE, Washington, DC (United States).