Installation of liquid phase catalytic exchange columns for the Wolsong tritium removal facility

  • 1. KEPRI, 103-16 Munji-dong, Yusong-gu, Daejon 305-380 (Korea, Republic of)
  • 2. KAERI, 150 Dukjin, Yusong-gu, Daejon 305-353 (Korea, Republic of)

Description

The catalyst loading and installation of liquid phase catalytic exchange (LPCE) columns for the Wolsong tritium removal facility (WTRF) was completed on the 22nd of April 2006. Two LPCE columns are connected in series. The first column has 28 sections, a sump and a separate overhead condenser. The second column has 27 sections, a sump and a humidifier. Each section of the LPCE columns consists of three parts: mass transfer packing bed, separate catalyst bed and liquid distributor. The Sulzer CY packing for the vapor-liquid mass transfer is packed into the inner shell of each section and the wet proofed catalyst for the vapor-gas reaction is loaded into between the inner and outer shell. The liquid distributors are equipped on the Sulzer CY packing of each section. The performance test will be accomplished according to the WTRF construction and commissioning schedule. The WTRF is the first commercial facility applying LPCE process for the tritium removal. The WTRF is expected to remove 7 MCi-tritium per year at least from the Wolsong CANDU6 reactors and will be a main tritium source for the ITER

Availability note (English)

Available from http://dx.doi.org/10.1016/j.fusengdes.2007.07.026

Additional details

Identifiers

DOI
10.1016/j.fusengdes.2007.07.026;
PII
S0920-3796(07)00364-X;

Publishing Information

Journal Title
Fusion Engineering and Design
Journal Volume
82
Journal Issue
15-24
Journal Page Range
p. 2264-2268
ISSN
0920-3796
CODEN
FEDEEE

Conference

Title
24. symposium on fusion technology
Acronym
SOFT-24
Dates
11-15 Sep 2006
Place
Warsaw (Poland)

Optional Information

Copyright
Copyright (c) 2007 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.