Published April 1995 | Version v1
Journal article

CEBAF endstation C status and experimental program

Creators

Description

Endstation C is designed to carry out a broad-range of nuclear and particle physics experiments with CW electron beams up to 4 GeV. The primary instrumentation, two large magnetic spectrometers called the High Momentum Spectrometer(HMS) and the Short Orbit Spectrometer (SOS), will be capable of coincidence operations at luminosities of 1038. The commissioning phase began in July 1994 while limited operations for physics started in December 1994. An overview will be presented of the proposed experimental program, endstation facilities, progress in commissioning, and commissioning data indicating

Additional details

Publishing Information

Journal Title
Bulletin of the American Physical Society
Journal Volume
40
Journal Issue
2
Journal Page Range
p. 1007b.
ISSN
0003-0503
CODEN
BAPSA6

Conference

Title
1993 joint meeting of the American Physical Society and the American Association of Physics Teachers.
Dates
12-15 Apr 1993.
Place
Washington, DC (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
28001634
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ACCELERATOR FACILITIES; CEBAF ACCELERATOR; MAGNETIC SPECTROMETERS; START-UP
Descriptors DEC
ACCELERATORS; LINEAR ACCELERATORS; MEASURING INSTRUMENTS; SPECTROMETERS

Optional Information

Secondary number(s)
CONF-9304297--.