Published November 1985 | Version v1
Journal article

Dynamic testing of pressure sensing lines in nuclear power plants

  • 1. Oak Ridge National Lab., TN

Description

Commercial nuclear power plants are equipped with instrumentation designed to detect unsafe conditions and, if required, to initiate protective action. The time elapsed between the realization of an unsafe condition and the initiation of protective action is known as the response time of the instrumentation involved. The US Nuclear Regulatory Commission has issued guidelines that advise periodic in situ response-time testing of safety-related instrumentation. No method is currently available for in situ response-time testing of pressure sensing lines (fluid-filled tubes connecting process to pressure transducer). A proposed method of doing just that has been investigated. While the proposed test (the burp test) was found to be impractical, a theoretical description of the sensing line led to the realization that it is probably not necessary to test the response time of sensing lines. Experimental observations backed up this conclusion

Additional details

Publishing Information

Journal Title
Trans. Am. Nucl. Soc.
Journal Volume
50
Series
Trans. Am. Nucl. Soc.
Journal Page Range
354-355
ISSN
0003-018X
CODEN
TANSA

Conference

Title
American Nuclear Society winter meeting.
Dates
10-15 Nov 1985.
Place
San Francisco, CA (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
17083150
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
LOSS OF FLOW; NUCLEAR POWER PLANTS; REACTOR INSTRUMENTATION; REACTOR MONITORING SYSTEMS; REACTOR SAFETY; SAFETY ENGINEERING; TESTING; US NRC
Descriptors DEC
ACCIDENTS; NATIONAL ORGANIZATIONS; NUCLEAR FACILITIES; POWER PLANTS; REACTOR ACCIDENTS; SAFETY; THERMAL POWER PLANTS; US ORGANIZATIONS

Optional Information

Secondary number(s)
CONF-851115--.