Electricity generation costs in new base load power plants in Poland to be introduced in 2010
Description
A review of new constructions of power plants is presented and basic technical data are given for 4 different power plants (hard coal fired, brown coal fired, natural gas fired combined cycle and nuclear) which were chosen for cost estimation of electric energy production. Then the following information is also given for 4 chosen power plants: duration of construction, capital costs, fixed charges of electric energy generation cost, operational and maintenance costs as well as fuel costs. The calculated costs of electric energy production for various types of power plants are presented in the tables. These costs were calculated for discount rates equal to 5% or 10%. The results of analysis of the sensibility of capital costs and fuel prices performed with changes of these parameters within the range of ±20% are also shown
Additional details
Publishing Information
- Imprint Title
- Nuclear Energy for Poland. Proceedings
- Imprint Pagination
- [171 p.]
- Journal Page Range
- p. 1-9
- Report number
- IAE--48/A
Conference
- Title
- International Seminar on Nuclear Energy for Poland
- Acronym
- NEP'99
- Dates
- 25-26 Mar 1999
- Place
- Warsaw (Poland)
INIS
- Country of Publication
- Poland
- Country of Input or Organization
- Poland
- INIS RN
- 31002507
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- COMPARATIVE EVALUATIONS; COST; ELECTRIC POWER; FOSSIL-FUEL POWER PLANTS; MEETINGS; NUCLEAR POWER PLANTS; POLAND; POWER GENERATION
- Descriptors DEC
- DEVELOPING COUNTRIES; EASTERN EUROPE; EUROPE; EVALUATION; NUCLEAR FACILITIES; POWER; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Notes
- Paper no. 3. 20 refs, 4 figs, 7 tabs Imprint:Different paginations