DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR THE SAVANNAH RIVER SITE'S DEFENSE WASTE PROCESSING FACILITY

Description

The Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) requested development of tooling for remote replacement of gaskets in mechanical Hanford connectors. The facility has compressed air supply, two master-slave manipulators (MSM's) and a lightweight robotic arm for operation of the remote tools. The Savannah River National Laboratory (SRNL) developed and tested multiple tools to perform the gasket replacement tasks. Separate pneumatic snap-ring removal tools that use the connector skirt as a reaction surface were developed for removal of the snap ring and spent gasket on both vertical and horizontal Hanford connectors. A pneumatic tool that clamps and centers on the jumper pipe ID was developed to simultaneously install the new gasket and snap ring. A pneumatic snap-ring-loading tool was developed that compresses the snap ring and places it in a groove in the installation tool. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. The entire system has been successfully tested using MSM's to manipulate the various tools. Deployment of the entire system is expected during FY08. The Hanford connector gasket replacement tooling has been successfully tested using MSM's to manipulate the various tools. Nitric acid is used in many of the decontamination processes performed in the REDC, where the tooling will be deployed. Although most of the tool components were fabricated/purchased with nitric acid and radioactive service in mind, some of the prototype parts must be replaced with parts that are more compatible with nitric acid/radioactive service. Several modifications to the various tools are needed to facilitate maintenance and replacement of failed components. Development of installation tools for replacement of 1-inch, 2-inch and multi-hole gaskets is being considered. Deployment of the existing system in the DWPF REDC is expected during FY08

Availability note (English)

Available from http://sti.srs.gov/fulltext/SRNL-RSE-2007-00088.pdf; PURL: https://www.osti.gov/servlets/purl/922282-IEbqgy/

Additional details

Publishing Information

Imprint Pagination
6 p.
Report number
SRNL-RSE--2007-00088

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
39025893
Subject category
S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
DESIGN; GASKETS; MAINTENANCE; MANIPULATORS; RADIOACTIVE WASTE FACILITIES; REMOTE HANDLING; SAVANNAH RIVER PLANT; TOOLS
Descriptors DEC
EQUIPMENT; LABORATORY EQUIPMENT; MATERIALS HANDLING EQUIPMENT; NATIONAL ORGANIZATIONS; NUCLEAR FACILITIES; REMOTE HANDLING EQUIPMENT; SEALS; US AEC; US DOE; US ERDA; US ORGANIZATIONS

Optional Information

Contract/Grant/Project number
AC09-96SR18500
Notes
American Nuclear Society EP and R and R and RS
Funding organization
US Department of Energy (United States)