Published August 1982
| Version v1
Journal article
Results of the 3rd regular inspection of Unit 5 in Fukushima No. 1 Nuclear Power Station
Description
The 3rd regular inspection of Unit 5 in the Fukushima No.1 Nuclear Power Station in fiscal 1981 was carried out from June 24 to October 9, 1981. Inspection was made on the reactor proper, reactor cooling system, instrumentation and control system, waste management, reactor containment, etc. By visual, disassembling, leakage, functional, performance and other inspections, abnormality was not observed. Radiation exposure dose during the inspection was all below the permissible level. During the regular inspection, the following improvement works and others were done: the repair of the power range instrumentation, and the repair of the liquid waste concentrator. (Mori, K.)
Additional details
Publishing Information
- Journal Title
- Genshiryoku Anzen Iinkai Geppo
- Journal Issue
- no.44
- Series
- Genshiryoku Anzen Iinkai Geppo.
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 15025524
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- FUKUSHIMA-5 REACTOR; INSPECTION; RADIATION DOSES; RADIOACTIVE WASTE FACILITIES; REACTOR INSTRUMENTATION; REACTOR MAINTENANCE; REPAIR
- Descriptors DEC
- BWR TYPE REACTORS; MAINTENANCE; NUCLEAR FACILITIES; POWER REACTORS; REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS