Development of full power risk monitoring system for nuclear power plant for UCN 3, 4
- 1. KAREI, Taejon (Korea, Republic of)
Description
Recently, RIA/R has been widely used which reduce costs by optimizing resources. One of essential RIAs is the development of computerized risk monitoring system which can evaluated the risk in real time using the plant configuration information such as basic event of inoperable equipments and environmental variables. KAERI has developed the full power risk monitoring system (DynaRM) for the UCN 3,4 NPPs. In order to develop UCN 3,4 full power risk monitoring system PSA model for risk monitor should be developed with reflecting the changes of plant configuration from the beginning of plant operation. As a risk monitor system, two main modules have been developed to monitor the current risk of the plant and to assist the maintenance schedule decision making
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Taejon (Korea, Republic of)
- Imprint Title
- Proceedings of the KNS autumn meeting
- Imprint Pagination
- [CD-ROM]
- Journal Page Range
- [15 p.]
Conference
- Title
- 2002 autumn meeting of the KNS
- Dates
- 24-25 Oct 2002
- Place
- Yongpyoung (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 34063561
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- DECISION MAKING; HAZARDS; MAINTENANCE; PROBABILITY; REACTOR MONITORING SYSTEMS; REACTOR OPERATION; SAFETY ANALYSIS; ULCHIN-3 REACTOR; ULCHIN-4 REACTOR
- Descriptors DEC
- ENRICHED URANIUM REACTORS; OPERATION; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 5 refs, 13 figs, 3 tabs