Published October 2002 | Version v1
Miscellaneous

Development of full power risk monitoring system for nuclear power plant for UCN 3, 4

  • 1. KAREI, Taejon (Korea, Republic of)

Description

Recently, RIA/R has been widely used which reduce costs by optimizing resources. One of essential RIAs is the development of computerized risk monitoring system which can evaluated the risk in real time using the plant configuration information such as basic event of inoperable equipments and environmental variables. KAERI has developed the full power risk monitoring system (DynaRM) for the UCN 3,4 NPPs. In order to develop UCN 3,4 full power risk monitoring system PSA model for risk monitor should be developed with reflecting the changes of plant configuration from the beginning of plant operation. As a risk monitor system, two main modules have been developed to monitor the current risk of the plant and to assist the maintenance schedule decision making

Part of:
Proceedings of the KNS autumn meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Taejon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[CD-ROM]
Journal Page Range
[15 p.]

Conference

Title
2002 autumn meeting of the KNS
Dates
24-25 Oct 2002
Place
Yongpyoung (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
34063561
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
DECISION MAKING; HAZARDS; MAINTENANCE; PROBABILITY; REACTOR MONITORING SYSTEMS; REACTOR OPERATION; SAFETY ANALYSIS; ULCHIN-3 REACTOR; ULCHIN-4 REACTOR
Descriptors DEC
ENRICHED URANIUM REACTORS; OPERATION; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
5 refs, 13 figs, 3 tabs